Most display assembly lines inspect thoroughly. What many lack is a document saying which characteristic is measured, how often, by what method, and what happens when the number moves. Without it, inspection produces a verdict per lot and nothing that can be defended as process evidence. A control plan closes that loop, and indices such as Cpk give it a number, but only where a number is honest. This article sets out where variables control earns its place, where attribute control is the truthful choice, and how to keep the plan credible under audit.
It proves control between inspections, not just conformance.
An inspection sheet records what one lot looked like. A control plan names the characteristic, method, frequency, reaction and owner, so the record shows whether the process held.
An inspection sheet answers a narrow question: did this sample pass? A control plan answers whether the process was in a state that would keep producing passing parts after the sample left the line. That difference decides field reliability on a display programme, because bonding thickness and gap drift between lots while every pass stamp looks identical.
The plan also fixes accountability. Each row carries a characteristic, a specification, a method, a sample size, a frequency, a control method and a reaction with an owner. The AIAG format is the common reference.
Thickness, gap, luminance, chromaticity and angle.
Variables control needs a number from an instrument that repeats. A characteristic graded good or bad by eye belongs in an attribute plan, whatever the drawing calls it.
The test is measurement, not importance. Bondline thickness, gap, luminance, chromaticity, contrast, viewing angle, bow and FPC pull force all return a number, so all can be charted if the gauge is capable. A gauge study should show repeatability and reproducibility small against the tolerance, the instrument should resolve about a tenth of it, and calibration should be traceable through a reference such as NIST.
Some are awkward. Pull force is destructive, so it is sampled by lot and charted as individuals. Luminance depends on warm-up and drive current, so the method must fix both, or the chart measures the test condition rather than the product.
Because the criterion is a judgement, not a measurement.
Mura, scratches and particles in the bond are graded against limit samples. Forcing a number onto a judgement produces a chart that moves with the inspector.
Cosmetic acceptance is defined by zone and by a visual limit, and the inspector compares against a reference rather than reading a dial. These belong in the plan as attribute checks with a stated sample, an acceptance number and a reference kept under controlled conditions.
Attribute control is not weaker control; it matches the data. Defect rate per unit still shows drift, and a defect map shows where defects cluster. What attribute data cannot do is produce a Cpk: an index built on inspector verdicts measures agreement between inspectors. Where a judgement carries real risk, run an attribute agreement study.
Limits have shapes, and the index has to follow the shape. Bondline thickness usually has a target with tolerances on both sides, gap often a maximum only, luminance a minimum, and chromaticity a target in two coordinates. Treating every row as a two-sided Cpk invites a meaningless number on half of them.
| Characteristic | Limit type | Capability question | What shifts it |
|---|---|---|---|
| Bondline thickness | Two-sided | Cpk against both limits | Adhesive lot, dispense volume |
| Gap, panel to bezel | Upper only | Cpu, not Cpk | Fixture wear, mould variation |
| Luminance | Lower only | Cpl at stated current | LED bin, backlight, driver setting |
| Uniformity ratio | Lower only | Cpl on the ratio | Bond pressure, diffuser position |
| Mura grade | Attribute | Defect rate, not Cpk | Bond voids, pressure, cleanliness |
A one-sided limit calls for Cpl or Cpu rather than Cpk, and a skewed distribution such as luminance near its floor needs a transform or the observed fraction beside the index. Process development for the bonding step sits with the R and D group.
A target copied from a customer manual without a look at the tolerance cannot be defended. The index is tolerance divided by process spread, so a wide tolerance on a well-behaved process clears 1.67 without effort, while a tight one on a bonding step may never clear 1.33 however much inspection is added. The target belongs to the characteristic.
Established practice gives a shape rather than a rule: 1.67 where failure is safety-related or stops the customer's line, 1.33 for standard production characteristics, and a lower initial figure while a process is proven. Those are conventions, and 1.33 on a characteristic whose gauge supplies most of the variation is arithmetic. Capability also assumes stability, so on a chart with a trend the index describes the last few hours.
Five consecutive units an hour beats one per shift.
Subgroup size comes from what can be measured under one set of conditions. Frequency comes from how fast the process moves, so both follow the mechanism.
Consecutive units bonded in a short window share an adhesive lot, a nozzle state and a lamp output, so variation inside the subgroup is common cause, and movement between subgroups is what the chart should catch. Mixing cavities or shifts inside one subgroup hides the shift the chart exists to detect.
Three to five consecutive modules an hour is a workable start for bonding thickness, tightened at start-up, after an adhesive change and at the start of each shift. Sampling tables in the ASSIST archive are where most frequency tables originate.
The reaction plan decides whether the document works, and it needs three levels. Seven points in one direction, or a run above the centre line, is a warning: check the inputs, keep producing, watch the next subgroup. A point beyond a control limit is stop-and-verify. A point outside the specification is containment.
Each level names who acts, how fast, and what gets checked first: on a bonding line, the adhesive lot and thaw time, the dispense needle, the lamp hours and the fixture. Containment means quarantining output back to the last verified subgroup, remeasuring suspect units by a second method, and recording a cause code. An adjustment is not a fix until a short capability check confirms the process returned, and the quality and reliability guide shows how those levels are written.
After any change that can move the mean or the spread.
A new adhesive lot, a refurbished tool, a replaced lamp or a changed line speed invalidates the index. Recalculate on enough subgroups to mean something.
List the triggers in the plan so nobody has to remember them: a new adhesive or panel lot, tool refurbishment, lamp replacement, fixture change, line speed or cure profile change, a new instrument. Each can shift a mean or widen a spread without touching the drawing.
Two practices keep recalculated indices honest. Do not compute capability from one subgroup taken after the change; wait for enough subgroups to cover the new condition, and say how many in the plan. Keep the superseded study, because the comparison is the evidence: a fall to a marginal figure across a supplier change needs a cause before the next submission.
As attribute and location data, not as a Cpk input.
An AOI verdict is pass or fail per unit and per defect type, so it feeds defect-rate charts, Pareto and alarms. A Cpk built on AOI scores measures the algorithm.
Automated optical inspection earns its place by covering every unit rather than a sample, which makes it the best detector of a step change in cosmetic and pattern defects. Charted by type and position, it shows whether a mura cluster sits at one corner, which points at bonding pressure, or spreads across the lot, which points at the panel supplier.
What AOI does not do is replace the variables plan. Treat it as screening and trending, keep variables checks where a real instrument exists, and track false calls and escapes, since a stable defect rate can mean a stable process or a blind algorithm. Visual criteria in IPC standards give the language for the acceptance limits AOI compares against, and the scope of the supplier's certified system sits on the quality certifications page.
Revision, characteristic list, reaction plan, evidence.
The first pass is documentary: does the plan match the drawing revision in force, name an owner for each reaction, and show that the stated frequency was followed.
The checklist follows the order a competent auditor tends to use, because each item can invalidate the ones after it. A plan written against an obsolete drawing, or missing a characteristic the customer marks as special, fails at the first page however well the line runs.
The reaction plan is where plans turn decorative, and the records are where they are contradicted: a stated frequency with three entries a week describes a process nobody runs. Review sits inside the quality system that ISO frames.
If your team is writing a control plan for a display assembly programme and needs the measurement data, optical results and capability evidence behind it, CDTech can supply those with the samples. Send the drawing revision and the characteristics you intend to chart to [email protected], or use the contact page to describe the checks you need evidenced.
Which display characteristics can be measured as variables?
Those that return a number from an instrument with adequate resolution: bondline thickness, gap and step, luminance, chromaticity, contrast, uniformity ratio, viewing angle, bow and FPC pull force. Each needs a gauge study showing repeatability and reproducibility small against the tolerance before the chart means anything. Importance alone does not qualify a characteristic, and neither does a drawing callout. If the only available verdict is a visual comparison against a reference sample, the characteristic belongs in the attribute plan.
What Cpk target is realistic?
It depends on the tolerance, the gauge and the cost of control. Established practice starts at 1.33 for standard production characteristics and 1.67 for safety-related or line-stopping ones, with a lower figure accepted while a process is being proven. A realistic target is one the process has demonstrated on a stable chart with a capable gauge. Asking for 1.67 on a characteristic whose measurement system consumes a third of the tolerance produces paperwork rather than capability.
How often should capability be recalculated?
Whenever a change can move the mean or the spread: a new adhesive or panel lot, tool repair, lamp replacement, fixture change, line speed change, new instrument, or a revised tolerance. Otherwise recalculate on a fixed cycle that the plan states, so the index does not age unnoticed. Use enough subgroups to cover the new condition rather than a single snapshot, and keep the superseded study so the direction and size of the change can be read from the two results together.
Does AOI replace SPC?
No. AOI gives a pass or fail verdict per unit, which supports defect-rate charts, Pareto analysis and alarms, but it discards the continuous measurement a variables chart needs for early warning. Use AOI for full coverage and for locating where defects cluster, keep variables checks on thickness, gap and optics where an instrument exists, and monitor AOI itself for false calls and escapes. A stable AOI defect rate can mean a stable process, or a stable blind spot.